Inside USF

USF Tampa Library Renovations

The first floor of the USF Tampa Library will be renovated during the Summer of 2014.

The first floor of the USF Tampa Library will be renovated during the summer of 2014, and will open at the start of Fall classes. Here’s what you need to know:

- Construction will take place May 5th – August 24th.

- During construction, only Starbucks, the Library Services Desk, and the IT Help Desk (located between the library entrance and exit) will be open on the first floor.

- Computers will be available for use on the 2nd floor, in LIB 209 and in the SMART Lab when testing is not underway.

- All other floors are available for study space.

- Librarian and ILL offices will be relocated to the 6th floor, so the 6th floor will not be super-quiet study space this summer.

Click here for a detailed list of where first floor resources will be relocated to during summer construction or get the updated floor plan map.


Keep an eye out for images of what the new first floor will look like — on display in the library lobby this summer!

USF News is produced by University Communications and Marketing.

To submit content, please review our Editorial Plans.